WebJan 10, 2024 · Low pressure steam leaks (15 psig) = $30 to $110 per leak per shift per year. Compressed air leaks (100 psig) = $30 to $90 per leak per shift per year. Submetering an evaporative cooling tower can result in sewage treatment savings (assume 1 percent water loss to evaporation), including: $9 per ton per shift per year based on size of … WebMay 5, 2009 · Post Likes. For air conditioning, it's 3 GPM/ton (tower) with a 10F rise through the condenser or 1.5 GPM/ton (city) with a 20F rise. This is based on the total heat of rejection (THR) being equal to 1.25 x evaporator tons and 1 ton = 1 horsepower. Gal/min-ton = (12000 x 1.25) Btu/hr-ton / (8.33 lb/gal x 60 min/hr x 10F x 1 btu/F) For ...
Chilled Water GPM per Ton - HVAC/R engineering - Eng …
WebOct 19, 2024 · Energy Engineering Rules of Thumb. These are general guidelines one can use when analyzing energy conservation measures. They are by no means laws. ... 300-600 ft 2 /ton: Ton: 12,000 BTU/ton: … WebJul 16, 2004 · On this basis, the standard water flow rate per ton can be calculated as follows: CHR (Btu/hr) = gpm x 500 x °F water temperature rise, or delta “T” For 15,000 Btu/hr CHR per ton, and 10° water temperature rise, 3 gpm per ton is the required flow rate. Example: 15000btu/hr/500x10degrees = 15,000/ 5,000 = 3gpm phoenix cleaners tulsa
Chiller Tonnage Sizing & Capacity Calculator Cold Shot Chillers
WebNov 7, 2024 · As a rule of thumb, you need to know at least three of these values in order to calculate the load: Flow rate (& fluid type), Inlet temperature, outlet temperature, and heat load or tonnage required. Going back to our example of a “10 ton” chiller requirement, we will provide some more solid information: Flow = 20gpm; ΔT = 10°F; Fluid is ... WebFeb 1, 1996 · These publications have concluded that the optimum condenser water flow rate per ton is, depending on the publication, 2 gpm (0.036 mL/J), 1.5 gpm (0.027 … WebRules of Thumb • Centrifugal Chillers: –Recirc rate = 3 gpm per ton @10°F delta T. –1.8 gph per ton evaporation rate. –With sensible heat loss 1.5 – 1.7 gph actual. –You will evaporate about 10 gpm per 1,000 gpm of flow at 10°ΔT. Using sensible heat loss about 8.5 gpm. • Absorption refrigeration: phoenix cleaning jobs